Lansing Best Asphalt Paving: Asphalt Driveway Paving and Sealcoating from a Lansing, MI Asphalt Contractor
Lansing Best Asphalt Paving is an asphalt paving contractor in Lansing, MI that lays new asphalt driveways over a compacted gravel base and repaves old ones that have broken up. Before any price, someone walks the pavement, because a soft base or standing water decides the fix. A 600-square-foot drive runs $6,995 to $8,385 here.
Request a quote
Your name, your number and the street the pavement is on. A callback follows.
There are usually two things you can do with your asphalt. The first one is to continue to sealcoat and repair it, which would keep it sound for years, but in case the whole base has given way, there's no other way than to replace it. One important note is that the plant that makes the hot asphalt closes around late November and opens again in April, so a paving job that misses this window has to wait for spring.
- Miss Dig called at least 72 hours ahead
- 600 sq ft drive $6,995 to $8,385 typical
- Park on new asphalt after 24 to 48 hours
- Cracks cleaned and filled before any seal coat
- Square feet and thickness written on the quote

At a glance
| Item | Typical figure |
|---|---|
| New drive, 600 sq ft | $6,995 to $8,385 |
| Driveway extension | $13.07 to $15.97 a square foot |
| Old drive torn out first | $765 to $2,305 for 600 sq ft |
| Paving season | April to late November, while hot mix plants run |
| Off the new asphalt | 24 to 48 hours before cars |
| Lifespan | 15 to 30 years, sealed after year one, then every 2 to 3 |
Residential Asphalt Driveway Paving and Repair

Asphalt Driveway Paving
A home driveway would usually get two to three inches of asphalt, pressed down, on six to eight inches of gravel, also pressed down. Clay soil could mean digging deeper and putting in more stone. New asphalt on a soft base would look fine at first, but would start failing within a season. Also keep in mind that when rolling is done, soil is filled in level with the edges, so a tire that rolls off the side does not crack them. We lay new drives over a compacted base. A 600 square foot drive usually runs $6,995 to $8,385, and the cars stay off it for 24 to 48 hours.

Driveway Sealcoating
The drive is swept and dry before any sealer goes on. The cracks are filled first. If not, water would still go down to the base through them. Sealing a 600 square foot driveway usually costs $1,000 to $2,000, including filling the cracks. But it also depends on the season, because during the cold fall it would dry slower, and a fall job waits for a few dry days in the forecast before it begins. We fill the cracks and seal the drive in one visit.

Asphalt Driveway Repair
The way it works is a hot patch replaces about the top two inches and lasts between one and two years. But alligator cracking, a pattern of small blocks like reptile skin, means the base underneath has failed. That needs a saw-cut patch. A square is cut out down to the stone, the stone is packed again, and the hole is filled with hot asphalt, which costs $4 to $12 for each square foot. Then the edges of the patch are sealed so water cannot run down the joints. We cut, pack and fill a patch like that in one visit.

Pothole Repair
Every pothole starts as a crack that let water in. On a driveway, the hole is cut square, cleaned out down to firm base and filled with hot asphalt in layers, each one rolled. One pothole would cost $100 to $400, but much of that is the cost of bringing the crew and machines out. It makes sense to fix every hole on the driveway in one visit and seal all the cracks around them, so you can save money on bringing the crew. We fix them all in one trip.

Driveway Replacement
The old asphalt is torn out, the ground is regraded, then new stone base and new asphalt go down. It is the only chance to fix whatever ruined the old driveway, and the most common causes are water collecting against the garage every spring and a base that was too thin, which would get fixed in the grading before any asphalt comes. We fix that cause before we pave.

Driveway Resurfacing and Overlay
We lay 1.5 to 2 inches of new asphalt over the old, glued down with a tack coat, which usually adds 8 to 15 years. Where the drive meets the garage slab or the apron, the old surface is milled down first. Then the new one meets them flush instead of standing a lip above them.

Crack Filling and Crack Sealing
Cracks between 1/8 and 3/4 inch that still move get hot rubberized sealer, poured once the crack is blown clean and dry. Filling lasts 1 to 2 years and sealing 3 to 8. On a drive you plan to keep, we'd pay for sealing. Get it done before the first hard freeze.

Driveway Apron Replacement
The apron at the street often breaks up first, since plow blades and street runoff reach it before the rest. We replace it on its own while a sound driveway stays. In Lansing the boulevard between sidewalk and street is city right-of-way, and the city's permit gives two weeks to put back any sidewalk or curb ramp taken out with the apron. We file that permit and set the new apron flush with the drive and the street.

Driveway Extension and Widening
We tie a wider drive or a parking pad beside the garage into the old paving, with the same base depth under it. The joint is cut straight and tack-coated so it doesn't open. Small areas cost more per foot. A pad for a trailer, boat or second car gets the thicker base a heavy load needs.
Find out what the pavement needs
Tell us roughly how big the driveway or lot is and what you see on it: cracks, low spots, crumbling edges, potholes. We call back with the fix that fits and a ballpark for it.
Commercial Parking Lot Paving and Striping
The business stays open, so we work a lot in sections, with signs at the entrances before any part closes.
Parking Lot Striping and Accessible Stalls
The 2010 ADA Standards tie accessible stalls to lot size. One for up to 25 spaces, two for 26 to 50, three for 51 to 75. One in every six of them is van-accessible. We lay out the stalls to that rule and restripe after every seal coat, after hours so the lot stays open.
Parking Lot Milling and Overlay
Milling grinds off the worn top so the new surface stays level with curbs and drains. We cut failed spots out to the stone and refill them first, or the old potholes come straight back. We mill and overlay in sections so the lot stays open.
Retail and Office Parking Lot Paving
We time paving around business hours and rake and roll by hand the corners a paver can't reach. Drains get checked first, since water standing on a lot is how its base fails.
Apartment and Condo Lot Sealcoating
We seal the lot in halves so residents always have somewhere to park, with notice posted before each half closes. Cracks are filled first, and the stripes go back once the coat cures.
HOA and Private Road Paving
A private road is the association's to maintain, not the county's. With garbage trucks and plows on it, heavy use calls for 4 inches of asphalt or more. We seal cracks as they show, which keeps an overlay from becoming a rebuild. We can pave a road in sections so residents keep a way in and out.
Specialty Asphalt Driveways and Site Work

Tar and Chip Driveways
We spray hot liquid asphalt over gravel and roll stone chips in before it cools. It costs well under hot mix and lasts 7 to 10 years. On a drive several hundred feet long, the kind found around Mason and Holt, that gap runs to thousands. We price it beside hot mix so you can weigh the two. Some owners pick it for the stone look. Expect loose chips the first weeks.

Recycled Asphalt Driveways
Millings are old pavement ground up. Rolled and warmed by the sun, they pack tighter than gravel. They suit a long farm lane or a pole barn pad where hot mix would cost too much. We roll them with a rubber-tired roller, which beats a steel drum on the uneven chunks. We'd skip anyone who sprays diesel on millings to bind them, because fuel dissolves the binder.

Asphalt Basketball Courts
We pave a backyard court like a driveway, base first, but a ball finds every birdbath. So the slope stays gentle and the roller makes extra passes. Lines and color wait until the asphalt cures. A court beside the drive can go in on the same visit as a new driveway.

Driveway Grading and Drainage
Lansing gets about 33 inches of rain and melted snow a year, and every drop needs a path away from the garage. Finished asphalt follows the slope of the stone base, so we set the crown and pitch in the grading. A crushed culvert under a rural apron is replaced before we pave. Low spots by the garage door get fixed before any asphalt goes down.

Asphalt Removal
We tear out old asphalt, concrete or loose millings when an owner moves to a new drive, and haul it away. Old asphalt goes back to the plant to be recycled. Near a city street tree, Lansing's Forestry office, (517) 483-4161, wants a call before anyone digs within 10 feet of it.
Asphalt Driveway Repair, Overlay or Replacement
Most driveways do not need to be torn out. A new layer on top works when the driveway is under 15 to 20 years old, the base is level and less than 25 to 30% of it needs repair. But you should tear it out and replace it once cracks cover 60 percent of it or run one to two inches deep. Lansing’s airport weather normals count 142.5 days a year at or below freezing and 52.6 days that stay frozen all day, which should definitely affect the asphalt. That leaves about 90 days a year that freeze at night and thaw in the day, and each one pushes water deeper into the open cracks. What you can do is look after it rains. Water that stays where the car parks means the base has sunk. A 12-year-old drive with firm edges and only a few cracks would totally fit the overlay case.
How a Lansing Blacktop Paving Job Runs
From the walk-around to the topsoil
- You describe the pavement on the phone and get a rough range.
- We walk it with you, checking the edges and where water sits.
- The written quote lists square feet and both thicknesses, with nothing blank.
- Miss Dig and any permit go in, and the day before, you hear when to move the cars.
- Base compacted, hot mix laid and rolled, edges shouldered, then a walk over the drive with you.
How Long Asphalt Paving Takes
| Step | Typical time | What sets it |
|---|---|---|
| Miss Dig locate | 72 hours or more | Miss Dig notice |
| Hot mix available | April to late November | Plants close in winter |
| New drive, no cars | 24 to 48 hours | Asphalt cooling |
| First seal coat | After about a year | Oils in new asphalt |
The season is when Michigan’s hot mix plants run, and cure and sealing from national cost guides.
What Asphalt Paving Costs in Lansing, MI
Lansing Asphalt Price Ranges
| Job | Typical range |
|---|---|
| New drive, 600 sq ft | $6,995 to $8,385 |
| Sealcoat, 600 sq ft | $990 to $2,010 |
| Tear-out, 600 sq ft | $765 to $2,305 |
| Extension, per sq ft | $13.07 to $15.97 |
| New drive, per sq ft | $5 to $12+ |
| Overlay, per sq ft | $1 to $3 |
| Crack work, per foot | $0.50 to $3.00 |
| One pothole | $100 to $400 |
| Tar and chip, per sq ft | $2 to $5 |
| Lot paving, per sq ft | $3 to $7 |
| Lot sealcoat, per sq ft | $1 to $2 |
| Striping, per stall | $4 to $5 |
These are market ranges, not a price list. The first four rows are Lansing figures for zip 48912 in 2026, basic labor on an easy site, crack filling included in the sealcoat row. The rest are national figures, and Lansing asphalt contractors tend to quote high in that range. The firm number comes after a walk over the pavement.
What moves the price
A home 15 to 20 miles or more from a hot mix plant can pay a $40 to $65 an hour delivery fee, and clay adds base stone. An overlay where the base allows, or several repairs in one visit, costs less.
Honestly, you may not care about having the driveway go gray. Unless you have an unlimited amount of money and want to maintain an image of wealth and abundance, you need not care about keeping the driveway black and looking new. But it’s up to everyone to decide where to spend their cash.
Don’t try to fill the crack or patch the hole yourself, because at first look it might look fine, but in a few months or even less it will look horrible or can cause more damage. It’s definitely better to pay someone who knows how to do it properly.
We walk it before we price it
A soft base, standing water and broken edges decide between a patch, an overlay and a tear-out, and none of them show in a photo. The firm quote comes after a look on site.
Driveways and Lots We Pave Around Lansing
Lansing Best Asphalt Paving paves, seals and patches driveways and lots in Lansing, MI and out through Ingham, Eaton and Clinton counties.
Ingham County, MI
- East Lansing
- Holt
- Okemos
- Mason
- Williamston
- Webberville
- Leslie
Eaton County, MI
- Dimondale
- Grand Ledge
- Potterville
- Eaton Rapids
- Charlotte
Clinton County, MI
- DeWitt
- St. Johns
Shiawassee and Ionia counties, MI
Holt is in Delhi Township and Okemos in Meridian Township, so street-side work there answers to the township and the county, not the City of Lansing.
East Lansing, Grand Ledge and Meridian Township ban coal-tar sealer, by local news reports. Seal coats there are asphalt emulsion.
Request a quote
A call to (517) 878-2459 gets you a ballpark soonest. Or send the form and we phone you back.
Asphalt Questions from Lansing Owners
How soon can I drive on a new asphalt driveway?
We would recommend waiting at least 24 to 48 hours before driving or parking on it, because the surface would be super soft. Turning the steering wheel while the car is not moving could scuff it.
When should a new asphalt driveway be sealed?
Generally, we would recommend doing it after about one year. Fresh asphalt still has oils in it that keep it flexible, and sealer does not stick well until they are gone.
How thick should an asphalt driveway be?
For a pickup pulling a trailer, or an RV, three to four inches on an 8 to 10 inch base is more recommended. The quote should give you the thickness after rolling.
How long does an asphalt driveway last in Michigan?
That would be 15 to 30 years if it's put in well and looked after. But rock salt used during winters damages asphalt, and you could use sand or calcium magnesium acetate on the driveway instead.
Can you still pave a driveway in October or November?
Often it's possible, as long as the hot mix plants are still open and the ground is not fully frozen. But we would advise getting the paving date in writing before you pay a deposit.
How do I spot a driveway paving scam?
The usual trick is an invoice with empty lines, and the price and the work get written in after you sign. We strongly recommend reporting it to the Michigan Attorney General as soon as possible.
Is coal-tar sealer banned around Lansing?
Meridian Township banned it, then East Lansing and Grand Ledge did too, because coal-tar sealer has about 50,000 ppm of harmful chemicals. To compare, asphalt-based sealer has about 500.
Does an asphalt contractor need a license in Michigan?
Not to lay asphalt at a house. A 1986 Attorney General opinion found that the state's home repair license law lists concrete but not asphalt.
Why is my asphalt driveway turning gray?
The sun dries out the binder, the black glue that holds the stones together, and the surface would go gray and brittle. To slow that down, a seal coat is usually applied, once the open cracks are filled.
