Driveway Resurfacing and Overlay
A new layer of asphalt over a Lansing driveway whose base still holds, milled flush at the garage and apron, or a straight answer that the drive needs replacing.
Lansing Best Asphalt Paving offers asphalt paving in Leslie, MI, and that covers driveway paving, seal coating and asphalt repair for Leslie homes.
Request a quote
Your name, your number and the street the pavement is on. A callback follows.
Since 43% of the homes built here were before 1940, most of these driveways are one-car drives to a back garage. Always measure to the house and the lot line. Widening the driveway to a two-car drive has to leave room between it and the line. Be sure to always ask your paving contractor if this is possible to avoid any tear-outs after you've paid for a paving job.

In Leslie, about 26% of homes are rented, and 5% are mobile homes. The median home was built in 1949, so paving or repaving could be tricky if you're trying to turn a one-car drive into a wider driveway. Find out if what you're doing is OK with the county or city.

To get back behind older homes for paving, there is often not enough room to get a full-size paver back there. Small paving equipment or even handwork is required in most places, with a plate compactor instead of a large rolling machine. An overlay should always be 1.5 to 2 inches deep.

On lots where cars move around all week and the plow is on them all winter, patchwork should be done to fill in all of the cracks, and then a good seal coat. Then the stalls and the accessible spots can be repainted.
Poorly drained soil underneath asphalt holds water near the surface. Here the water sits from the surface to 18 inches down, so you’ll always want your packed stone sloping toward the street. Along Huntoon Creek through downtown there can be many places of low ground where drainage is important for the asphalt to keep its integrity, without sinkholes or cracks through years of hot and freezing cold weather.
In the city, a drive on a city street needs a driveway permit from City Hall. Front-yard parking is allowed on a driveway only. For a lot for four or more cars, the plans and code want a dustless surface. That means an entire lot of asphalt or an entire lot of concrete, not gravel. The zoning administrator of the city is who checks the plans against the city codes. Always be sure to check with the city before any asphalt or concrete work is done.
From Lansing, Leslie is a 32-minute drive down US-127, 22 miles by road. A drive that meets a county road needs a permit from the Ingham County Road Department in Mason, $250 to resurface or replace a home drive.
We also serve Perry, MI, east of Lansing off I-69, on sandy ground.
Leslie has a population of about 1,936. Here is what that means for the work we do here.
| Local fact | Detail |
|---|---|
| Homes built before 1940 | 43% of the city's 841 homes; the median one dates from 1949. |
| Owner-occupied homes | 73.5%; 75% of homes are single-family detached houses. |
| Ground near the center | Much of it mapped as urban land, mixed with Marlette, Capac, Colwood and Boyer soils. |
| Huntoon Creek | Runs through downtown; Capac and Colwood loams beside it hold water near the surface. |
| Driveway permit | From City Hall on a city street; $250 from the Ingham County Road Department on a county road. |
| County | Ingham County; Leslie Township surrounds the city. |
A new layer of asphalt over a Lansing driveway whose base still holds, milled flush at the garage and apron, or a straight answer that the drive needs replacing.
Potholes, alligator cracking, broken edges and low spots on Lansing driveways and lots, cut out and patched in hot mix down to a firm base.
Restriping and new layouts for Lansing parking lots, with accessible stalls counted against the ADA table and the lot kept half open while the paint dries.
Cracks in Lansing driveways and lots blown clean and sealed with hot rubberized sealant, or filled where they barely move, before winter water gets under them.
Patching, crack sealing, milled overlays and new asphalt lots in Lansing, priced after the drains and the base have been checked.
The old pavement tear-out, plus putting in a new base and compacting, then paving over this compacted base, can take one to two days. Cars should stay off at least one to two days, depending on the heat.
Yes, there are recycled asphalt millings or tar and chip, which is hot liquid asphalt sprayed down and covered with stone chips. Both these options can be good for light use. It's a good idea to pave only the first stretch.
Always pave or repave after a sewer line repair. The fill needs to be compacted in layers so the trench doesn't keep settling after the pavement is done. Do it in this order to save money in the future.
Often. A low spot can be cut out, its base built back up, and a hot patch rolled in flush with the rest. If water stands across the whole drive, the slope is wrong and the drive needs regrading.
Mark both edges with tall stakes before the first snow. A paved edge set flush with the lawn also gives a plow blade less to catch on than a raised lip.
Not directly. Brick and cinders shift and hold water, so the asphalt over them cracks. They come out, or get covered with enough compacted stone to bridge them, before any paving.
Tell us roughly how big the driveway or lot is and what you see on it: cracks, low spots, crumbling edges, potholes. We call back with the fix that fits and a ballpark for it.
A call to (517) 878-2459 gets you a ballpark soonest. Or send the form and we phone you back.