Asphalt Milling in Lansing, MI
Lansing Best Asphalt Paving does asphalt milling for lots, private roads and drives. A drum lined with carbide teeth grinds the worn surface away, so the new asphalt meets the curbs and drains at the height they had. We work Lansing, then East Lansing, Okemos, Holt, DeWitt, Grand Ledge and Mason.
Request a quote
Your name, your number and the street the pavement is on. A callback follows.
When a lot is milled, a drum that has large carbide teeth grinds the old pavement off the ground onto a conveyor belt that loads it onto the truck alongside it. The teeth can wear out in hours and need to be replaced often. The new lot is ready for new pavement.
- Depth set to the damage, not one depth for the whole lot
- Curbs and manholes kept at their height
- Cross slope corrected where water stands
- Millings hauled to the plant for recycling
- Surface swept clean before the tack coat

Estimate a milling job
Typical prices per sq ft for Lansing jobs. Your quote follows a look at the job.
$1,875 to $5,625
Call (517) 878-2459 for your priceAt a glance
| Item | Typical figure |
|---|---|
| Milling | $0.25 to $0.75 per sq ft |
| New top layer after milling | $1 to $3 per sq ft |
| Lot resurfacing, per space | $300 to $900 |
| 25-car lot resurfaced | $7,500 to $22,500 |
| Depth control | Within about 0.2 inch of the target |
Asphalt Milling Services

Mill and Overlay
A mill and overlay can ensure that the new layer of pavement going on will match the original height at things like curbs and drains. This can be a great option if you need to keep the same height but need a new layer on top.

Milling to Fix Slope and Drainage
Water standing in the middle of a lot or against a building usually means the surface has lost its pitch. The drum cuts deeper on one side than the other to set a new cross slope, and the paving follows it.

Full-Depth Milling
Where the asphalt has broken into blocks all the way down, the planer takes it off to the stone. New base goes in and the full thickness is paved again. It costs more than a surface cut, and it's the only cut that fixes a failed base.

Micro-Milling
A drum with three to four times as many teeth takes off a thin layer and leaves a much finer surface. It's for shallow wear, where a standard cut would take off more than the damage.
Related Work
Rut and Shove Removal
Milling can be just for ruts at drive-through lanes, where heavy trucks left ridges in the existing pavement. If the rest of the lot or drive is good, it should not need milling.
Manholes and Catch Basins
Each casting in the cut gets marked before milling and checked against the new grade after. A grate that ends up low collects a puddle. One left high gets clipped by plows every winter.
Patching After the Cut
Milling shows what the old top was hiding. Soft spots found in the base get dug out and rebuilt before the new layer goes down.
Private Roads and Long Drives
A rutted private road can be milled and repaved in lanes.
When Does Asphalt Need Milling Before Paving?
Whether milling is needed before new asphalt is put over old asphalt will depend on the height of your curbs, drains, doorways and loading docks, which cannot be higher than they are now. Milling will grind it down so the new surface will be at the same height as the old existing pavement. If the height doesn’t matter and there are no ruts, no milling would be necessary.
Mill and overlay
The right call for most commercial lots. Every layer laid without milling raises the lot, and after a few of them the curb is nearly flush and rain runs over it toward the building.
Overlay without milling
Fine on a lot or a drive that ends at grass and has height to spare. Milling there adds a day of trucks and the cost of the cut and gains nothing. We’d say so at the walk-through.
How Asphalt Milling Works on a Lot
Walk it and mark the depths
Ruts, cracked areas, low spots and every casting get marked, and the depth is set for each zone.
Set the drum
The cold planer’s automatic depth control holds the cut within about 0.2 inch of the target.
Cut and load
The drum spins against the pavement, scrolls on it feed the chunks to a conveyor, and the conveyor drops them in a truck running alongside.
Change the teeth
The carbide teeth wear fast. Some last a few hours in hard pavement, and a dull drum leaves a ragged cut.
Sweep and inspect
The milled area is swept clean and any soft base that turned up gets marked for repair.
Tack and pave
A tack coat goes down on the clean milled surface and the new asphalt follows.
What Asphalt Milling Costs
Asphalt milling usually costs $0.25 to $0.75 a square foot. A new top layer adds $1 to $3, which puts a mill and overlay at roughly $1.25 to $3.75 a square foot. Most of the bill is the new asphalt, not the cut.
An overlay is a new layer of asphalt that is laid on top of the old existing asphalt, at a cost of around $1.25 to $3.75 a square foot. A straight overlay is $1 to $3 a foot and can fill in grooves worn by tires with a thin layer.
| Job | Typical range |
|---|---|
| Milling, per sq ft | $0.25 to $0.75 |
| New top layer, per sq ft | $1 to $3 |
| Lot resurfacing, per space | $300 to $900 |
| 10-car lot resurfaced | $3,000 to $9,000 |
| 25-car lot resurfaced | $7,500 to $22,500 |
| Full replacement, per sq ft | $4 to $10 |
These are national ranges for 2026. A space counts about 300 square feet with its share of the lanes and entrances. Base repairs and new striping come on top.
What affects the price
Every job is quoted after we see it. These are the things that move the number up or down.
Depth
A deeper cut takes more passes and fills more trucks, and a full-depth cut means new base stone after it
Size
The cold planer, its trucks and the sweeper come out for a small job too, so small areas cost more a foot
Haul
Every load of millings goes to the plant, and a long drive out adds truck hours
What turns up underneath
Soft base found under the old top gets dug out and rebuilt before paving
Castings
Manholes and catch basins that have to come up to the new height add work at each one
Asphalt Milling in nearby areas
Asphalt Milling FAQs
How deep do they mill asphalt?
The milling typically goes as deep as the new layer that's going on, so that the height stays the same when the new asphalt is put on.
Is asphalt milling the same as grinding?
Milling can also be categorized as grinding or cold planing. They all get the same job done with the same result.
Do I pay extra to haul the old asphalt away?
In most cases, hauling away the old asphalt is included in the quote. The old asphalt is then recycled into new hot mix or screened and sold for driveways. There is rarely a dump fee.
Can a driveway be milled?
Yes, it's usually the garage and apron only. If there are wheel tracks and ruts, the whole drive should be done. In a lot of cases, a few specific areas need to be milled for height purposes.
Does a driveway need milling before sealcoating?
Sealing is always done after the milling and the new asphalt are applied. The seal coat is a thin film and doesn't add any real height to the new asphalt.
Does milling make a lot of dust?
While the milling is taking place, water is sprayed on the drum that is chewing up the old pavement, which keeps the dust down. A sweeper follows the machine to pick up the debris.
Get a quote on your asphalt milling
Tell us roughly how big the driveway or lot is and what you see on it: cracks, low spots, crumbling edges, potholes. We call back with the fix that fits and a ballpark for it.
Request a quote